McMillan Road Improvement Project
The project scope includes:
- Asphalt deep patch mill sections of road experiencing asphalt failures - Deep patch milled areas will be filled with 4” of 25 mm Superpave Asphalt.
- Milling and repaving the entire road length to be flush with the existing gutter line
- Replacing damaged sections of sidewalk, curb, gutter, driveway aprons, and storm drainage structure/tops, as identified on the construction plans
- Guardrail replacement, as identified on the construction plans
- Thermoplastic striping, crosswalk striping, and sign replacement
- Erosion control and sod disturbed areas